JOANLAB Water Bath with Magnetic Stirrer 100 ~ 1200 RPM 3 Liter WBS-6PRO - joanLab.id
JOANLAB Water Bath with Magnetic Stirrer 100 ~ 1200 RPM 3 Liter WBS-6PRO
JOANLAB Water Bath with Magnetic Stirrer 100 ~ 1200 RPM 3 Liter WBS-6PRO JOANLAB Water Bath with Magnetic Stirrer 100 ~ 1200 RPM 3 Liter WBS-6PRO JOANLAB Water Bath with Magnetic Stirrer 100 ~ 1200 RPM 3 Liter WBS-6PRO JOANLAB Water Bath with Magnetic Stirrer 100 ~ 1200 RPM 3 Liter WBS-6PRO JOANLAB Water Bath with Magnetic Stirrer 100 ~ 1200 RPM 3 Liter WBS-6PRO JOANLAB Water Bath with Magnetic Stirrer 100 ~ 1200 RPM 3 Liter WBS-6PRO JOANLAB Water Bath with Magnetic Stirrer 100 ~ 1200 RPM 3 Liter WBS-6PRO JOANLAB Water Bath with Magnetic Stirrer 100 ~ 1200 RPM 3 Liter WBS-6PRO

JOANLAB Water Bath with Magnetic Stirrer 100 ~ 1200 RPM 3 Liter WBS-6PRO

Rp 3.240.000 Rp 3.600.000 10% OFF

Waterbath yang sudah digabungkan dengan fungsi magnetic stirrer juga!

Kemampuannya menjaga stabilitas suhu membuat waterbath ini menjadi andalan


Spesifikasi:

Stirrer: 100 ~ 1200 RPM dengan increment 50 RPM

Temperatur: Suhu ruangan +5°C ~ 100°C (Akurasi ±1°C)

Ukuran Liner: 200 X 200 X 130 mm / cukup untuk 2L flask atau 3L beaker

Ukuran alat: 260 X 265 X 325 mm

Resolusi display LCD: 0.1°C

Timer: 1 menit ~ 23 jam 59 menit

Power: 800 W

Berat 3750 gram
Kondisi Baru

1 unit WB-6PRO

1 unit safety handle

1 unit bearing frame

2 unit stirring bar

2 unit baut

1 unit obeng

1 unit kabel power

Manual

Produk Terkait

JOANLAB Water Bath Digital 2 Hole Lubang Timer WB100-2
JOANLAB Water Bath Digital 2 Hole Lubang Timer WB100-2

Rp 1.755.000

Lihat Detail
JOANLAB Water Bath Digital 1 Hole Lubang Timer WB100-1
JOANLAB Water Bath Digital 1 Hole Lubang Timer WB100-1

Rp 1.350.000

Lihat Detail
JOANLAB Water Bath Digital 4 Hole Lubang Timer WB100-4
JOANLAB Water Bath Digital 4 Hole Lubang Timer WB100-4

Rp 2.295.000

Lihat Detail
JOANLAB Water Bath Digital 6 Hole Lubang Timer WB100-6
JOANLAB Water Bath Digital 6 Hole Lubang Timer WB100-6

Rp 2.835.000

Lihat Detail